Time to remove
that old kitchen. We can arrange disposal of your old kitchen and
remove old tiles and flooring as required. |
|
In this case
tiles and flooring were removed. The boxing-in revealed a cold water
pipe with severe condensation causing damp problems. |
|
|
|
|
|
|
|
|
 |
|
 |
|
|
|
|
|
|
|
Transformed!
The new kitchen fitted. In this case the kitchen was ordered from
homebase and delivered to the customer directly. |
|
In total this
kitchen took 6 days though it did include fitting the extractor,
tiled spashback and ceramic tile flooring. Note modified boxing-in
and cold pipe lagging. |
|
|
|
|
|
|
|
|
|
 |
|
 |
|
|
|
|
|
|
|
This
kitchen featured a tremendous amount of tiling on plasterboard walls.
In this case tile removal would have been extremely messy and time
consuming. |
|
The alternative
was to fix plasterboard to the tiling. This is also sometimes the
best option if the walls are back to bare brick. |
|
|
|
|
|
|
|
|
|
 |
|
 |
|
|
|
|
|
|
|
This
kitchen was completed in five days including plasterboarding, travertine
effect laminate floor and tiled splashback. |
|
The kitchen
in this case was delivered direct to the customer by B&Q and
features a pull out larder and corner carousel. |
|
|